current location current location: home >  case

Kazakhstan Aktobe Project

big middle small
2023.05.05
read:110seconds

Project Name: Aktobe linepipe project

Transmission Medium:waste water from Oilfield

Medium Temp.:70℃;

Spec. And Length:DN50-6.3MPa 19.6Km; DN80-6.3MPa 2.75Km;

Laid Area: Marshland;

Put into operation time: Nov. Of 2019

202305051048435866.jpg


Back to top

Back to top

Copyright © Baoji TIANLIAN Huitong composite material Co., Ltd Copyright  
Sitemap | RSS  | XML    nodmsg! Please log in to the website background to view

technical support: dongliwuxian  
Douyin case