Project Name: Aktobe linepipe project
Transmission Medium:waste water from Oilfield
Medium Temp.:70℃;
Spec. And Length:DN50-6.3MPa 19.6Km; DN80-6.3MPa 2.75Km;
Laid Area: Marshland;
Put into operation time: Nov. Of 2019
Back to top
Copyright © Baoji TIANLIAN Huitong composite material Co., Ltd Copyright
Sitemap | RSS | XML nodmsg! Please log in to the website background to view