current location current location: home >  case

Xinjiang Tarim Oilfield Project

big middle small
2023.05.05
read:107seconds

Project Name: Tarim oilfield linepipe

Transmission Medium: Produced water from gas field:

Medium Temp.: 5~70℃;

Spec and Length: DN150-6.4MPa, 31.5Km;

Laid Area: Desert;

Put into operation: July of 2020


Back to top

Back to top

Copyright © Baoji TIANLIAN Huitong composite material Co., Ltd Copyright  
Sitemap | RSS  | XML    nodmsg! Please log in to the website background to view

technical support: dongliwuxian  
Douyin case